Runway 21 Extension Details
Extension of:
- Runway 21 - 800’ x 150’
- Placement of approximately 2 million CY of embankment
- Existing parallel Taxiway “A”
Construction of:
- Runway 21 Blast Pad – 200’ x 200’
- Paved runway shoulders (20’ wide)
- A new bypass taxiway
- Storm sewer and storm water management facilities
Installation of:
- Associated runway and taxiway edge lighting & signage
- Temporary offset localizer and DME for Runway 3
- Permanent localizer and DME for Runway 3
- New Runway 3 PAPI
- Relocation of perimeter access road (current phase)
- Replacement of existing Runway 21 VASI with PAPI
- Potential land acquisition for RPZ control, potential borrow material, and/or obstruction removal